esulerzy
Mouseketeer
- Joined
- Apr 30, 2001
I'm sure this has been answered before but my search function is taking an afternoon break.....
When will the construction in the main lodge be complete? With all the "upgrades" going on I'm wondering how long the construction will last and specifically, if my scheduled trip in Dec/Jan will be affected. I have a savannah room booked for Dec 30th - Jan 4th. I own at SSR but really wanted to have my traveling companion stay at AKL (not using points for this trip).
TIA!
When will the construction in the main lodge be complete? With all the "upgrades" going on I'm wondering how long the construction will last and specifically, if my scheduled trip in Dec/Jan will be affected. I have a savannah room booked for Dec 30th - Jan 4th. I own at SSR but really wanted to have my traveling companion stay at AKL (not using points for this trip).
TIA!